June 24, 2022
PACIFIC COAST TERMINALS CO. LTD.

MAINTENANCE SHUTDOWN WORK

July 8-21, 2022

Pacific Coast Terminals Co. Ltd. (PCT) wishes to advise our neighbours that we will performing a maintenance shutdown from July 8 to July 21, 2022.
The terminal’s sulphur rail car unloading, stockpiling, and Berth 2 vessel loading operations will be shutdown. Potash rail unloading will be down for 5 days approximately July 11 to 15. Berth 1 liquids vessel loading and liquid railcar unloading will remain active. There will be a number of projects being completed with the majority of work being concentrated on the Sulphur Stakrake, Conveyors, Rail Yard and Quadrant Ship Loader. The work will require the use of welders, hand tools, lifting equipment, and high pressure water washers. We understand the inconvenience to residents as this may result in having noise and light emitted from our terminal, and we will work to ensure that community disturbance is minimized wherever possible and we apologize in advance.

The contractor work will be performed during regular work hours, 7 days per week.

PCT will do everything possible to perform the work as quickly as we can. We wish to apologize in advance for any inconvenience this may cause our neighbours. If you have any questions or concerns please contact us by email at info@pct.ca, or by phone at 604-939-7371. After business hours please call 604-931-9211.

Maintenance Shutdown Notice July 2022

Website designed by Ballistic Arts Media Studios Inc.

Copyright 2014 Pacific Coast Terminals | Site Map | Disclaimer | Privacy Policy