July 8th, 2021

PACIFIC COAST TERMINALS CO. LTD.

MAINTENANCE SHUTDOWN WORK – NEW DATES

July 12th – 30th, 2021

Pacific Coast Terminals Co. Ltd. (PCT) wishes to advise our neighbours that we will performing a maintenance shutdown. Due to issues with forest fires and resulting impacts on rail traffic we are amending our previously published shut down dates of July 10th – July 24th to July 12th – 30th, 2021.

The terminal’s sulphur rail car unloading, stockpiling, and Berth 2 vessel loading operations will be shutdown. Berth 1 liquids will remain active, as well as potash unloading. There will be a number of projects being completed with the majority of work being concentrated on the Sulphur Stakrake, Conveyors and Quadrant Ship Loader. The work will require the use of welders, hand tools, lifting equipment, and high pressure water washers. We understand the inconvenience to residents as this may result in having noise and light emitted from our terminal, and we will work to ensure that community disturbance is minimized wherever possible and we apologize in advance.

The contractor work will be performed during regular work hours, 7 days per week, and there will be no night shifts for this shutdown.

PCT will do everything possible to perform the work as quickly as we can.  We wish to apologize in advance for any inconvenience this may cause our neighbours.  If you have any questions or concerns please contact us by email at info@pct.ca, or by phone at 604-939-7371. After business hours please call 604-931-9211.

Website designed by Ballistic Arts Media Studios Inc.

Copyright 2014 Pacific Coast Terminals | Site Map | Disclaimer | Privacy Policy