Pacific Coast Terminals Co. Ltd. (PCT) wishes to advise our neighbours that we will performing critical maintenance repair work from October 1st – October 14th on the Quadrant Shiploader located at Berth 2.

The terminal’s normal Berth 2 sulfur vessel loading operation will be shutdown specifically for this repair (Berth 1 liquids will remain active) and all activities will be focused in the area highlighted below. Work will be steel construction in nature and will require the use of power tools, welder/generator and work area lighting. We understand the inconvenience to residents, as this may result in having noise and light emitted from our terminal and apologize in advance.

 

These activities are anticipated, in addition to regular work hours, from 8pm-7am, Monday to Sunday

PCT will do everything possible to perform the work quickly as possible. We wish to apologize in advance for any inconvenience this may cause our neighbours. If you have any questions or concerns, please contact us either by phone or email at info@pct.ca.

Website designed by Ballistic Arts Media Studios Inc.

Copyright 2014 Pacific Coast Terminals | Site Map | Disclaimer | Privacy Policy